Solutions

01

PROJECT MANAGEMENT

Our experienced team of Project Managers and Site Supervisors work closely with builder, engineers and other trades to ensure projects are delivered on time and within budget.

02

INSTALLATION

We co-ordinate and manage closely all aspects of installation (planning and methodologies) to maintain program, client expectations and project requirements.

03

PROCUREMENT

The establishment of a strong relationship with our preferred suppliers that share our values and principles, has been the key to the company success. It is this collaboration that enables us to achieve tight project deadlines whilst still maintaining the compliance quality requirements of each project

04

FABRICATION

We deliver the highest quality fabrication services which can include welding, orbital welding, cutting, bending, and assembling processes

05

Our Resources

Pure Piping trade personnel are second-to-none in the field, highly qualified, experienced and committed to working along-side our clients to provide exceptional results. Our core team have Trade Certificates in Engineering (Fabrication) or Plumbing and most have attained Certificate 7in Gas Tungsten Arc Welding (GTAW) to AS1796. Pure Piping employees are all entitled to the PPTEU’s enterprise bargaining agreement (EBA). The decision for our company to sign the EBA was to ensure our employees work under the best industry agreement and entitlements for them (e.g. RDOs, holiday leave, long service leave, redundancy fund). The best conditions ensure we have the best employees in our unique high purity industry. We have recently doubled our factory space at 32 The Concord, Bundoora. This has increased our premises to 640sq metres. Our factory is home to additional equipment such as our forklift, brake press, band saw’s, pedestal drill, polishing grinders and a range of material stock. To ensure a superior finished product Pure Piping uses high quality, well-maintained welding equipment.

06

Current equipment

  • 12x OrbimatOrbital Welding Machines, all with test and calibration certificates.
  • 1x Orbitwin 165CA Parallel Switching Box which allows for the connectionof two welder heads from one machine.
  • 1x OW12 weld head, weld range3-12mm.
  • 3x OW17weld head, weld range 6mm-13mm.
  • 3x 38S weld heads, weld range 6mm-38mm.
  • 8x 76Sweld heads, weld range 6mm-76mm.
  • 2x 115S weld head, weld range 25mm-115mm.
  • 1x 170S weld head, weld range 25mm-170mm.
  • 36x TIG welding machines.
  • 12x specialist tube cutting machines.
  • 7x tube end facing tools, ensures perfect square tube ends for precision orbital welding.
  • Magnehelic–With our extensive experience welding small size pipe/tube, we know how to ensure correct internal gas pressure usinga Magnehelic.
  • Purge Monitor–Our calibrated gas monitors enable us to know for certain all oxygen is removed from the line during purging, ensuring we provide the cleanest internal welds possible.
  • 12x Laser levels–Our calibrated laser levels ensure our pipework and equipment is installed accurately to the project specifications.
  • 2x Passivation Skids–Manufactured in house to ensure all requirements could be catered for. Skid options-800L tank for large applications, 80Ltank for smaller applications
  • 1x Agilent Helium Leak Detector
  • 1x BeckmanCoulter Particle Counter
  • 2x TPS WP-81 Conductivity, pH and Temperature Meters

07

Our experience

  • Product lines
  • High purity water
  • High purity steam
  • Caustic/acids/corrosives
  • Semi-conductor gasses
  • Medical gasses
  • Pharmaceutical
  • Semiconductor / Specialty Gases
  • Laboratory
  • Medical
  • Water Treatment
  • Chemical
  • Food & Beverage
  • Oil & Gas

08

Pure Piping’s Quality Assurance

Pure Piping strives to produce the highest Quality Assurance documentation possible.  The QA pack we provide for our clients is set out in a very clear, practical way which captures all required components of the project.

Feedback from our clients’ QA departments have reflected this and we take great pride in knowing we have handed over a comprehensive system with full traceability of all components and workmanship.  We ensure our documentation meets or surpasses the required standards as per our clients’ regulating body such as Therapeutic Goods of Australia (TGA), Australian Pesticides and Veterinary Medicines Authority (APVMA) or Asia Industrial Gases Association (AIGA).

Our quality pack complies with all codes of GMP (Good Manufacturing Practice), is equivalent to ISO 9001 and prepared in accordance with AS/NZS ISO 9004.5 (Int.).

Our pack has been developed to be compliant with:

  • AS 1796 Certification of welders and welding supervisors
  • AS 3992 Pressure Equipment-Welding and brazing qualification
  • AS 4041 Pressure Piping
  • ASME BPE Bioprocessing Equipment
  • ASME B31.3 Process piping

Our QA Pack includes the following sections to meet the requirements of ASME BPE section GR-5:

  • Orbital and hand welding procedures: As per AS 3992, section 3 and ASME BPE, GR-5.2.1.1.1 (b)
  • Welder Qualifications: As per AS 3992, section 9 and ASME BPE, GR-5.2.1.1.1 (b)
  • Welder Identification:
  • Welder NDT reports: As per AS 3992, section 9.5.1
  • Welding Machine Inventory
  • Calibration certificates and records of equipment and instruments supplied by NATA approved providers: As per ASME BPE, GR-5.2.1.1.1 (d)
  • Gas data sheets: As per ASME BPE, GR-5.2.1.1.1 (d)
  • Material Register including certificates listing chemical and physical analysis: As per ASME BPE, GR-5.2.1.1.1 (a)
  • Weld Register including weld maps/logs and weld inspections: As per ASME BPE, GR 5.4
  • Coupon Log: As per ASME BPE, GR 5.2.1.1.1 (c)
  • Inspection Test Reports (ITRs): As per ASME BPE, GR-5.2.1.1.1
  • Pressure Test Records: As per ASME BPE, GR-5.2.1.1.1 (d)
  • Flushing and Cleaning procedure record: As per ASME BPE, GR-5.2.1.1.1 (d)
  • Mechanical Completion Certificate (per service)