CSL Behring

PROJECT DATE:

December 2019 – November 2020

PROJECT VALUE:

$3,000,000

Project Aurora – Module 1 Fractionation
Installation of all process services in the Fractionation production area of the new Aurora facility Module 1, located within at CSL Behring. Fractionation Module 1 consists of two bays consisting of-
• 8 x Product Vessels and associated pipework
• 2 x Filter Press and associated pipework
• 16 x Technical corridor service skids
Services installed include Product, Clean-In-Place, Ethanol, Buffer, Acids, Filtered Air, Nitrogen, Vents & Drains.

IgLab Module IV – Privigen & Hizentra, 0.2μm Filtration Sterilisation

Installation of all process services in the 0.2μm Filtration & Bulk Storage Vessels production area of the new IgLAB Module IV, located within the Turner Facility at CSL Behring.

Process services were installed for Tank H3 & Tank H4 within the Sterile Filtration production area and technical corridor.

Services included: Product, Clean-In-Place Supply & Return, Filtered Compressed Air, Pure Steam and Water For Injection. 

   CSL Behring – March – April 2017

Mechanical/Process Project Value – $450,000.

IgLab Module IV – Privigen & Hizentra, Subfractionation

Installation of all process services in the Bulk Subfractionation production area of the new IgLAB Module IV, located within the Turner Facility at CSL Behring.

Services were installed to Tank A2, Filter Press 3, Tank B2 & Ultra Filter 4 within the production area and technical corridor. 

Services included: Product, Sodium Acetate, Clean-In-Place Supply & Return, Pure Steam, Water For Injection, Hydrochloric Acid, Filtered Compressed Air and Octanoic Acid.    

                                                          CSL Behring – February – July 2017

Mechanical/Process Project Value – $650,000.

AlbuRx Special Waters Building – MF Permeate and PWG

Decommission of existing Microfiltration (MF) Permeate Tank (10,000L) and installation of new MF Permeate Tank (30,000L) in the Special Waters Building of CSL Behring.

Installation of new Microfiltration unit.

Installation of new Pure Water generator.

Services included: Mircofiltration, Purified Water, Reverse Osmosis, Compressed Air and Domestic Cold Water.   

                                      CSL Behring – December 2016 – January 2017Mechanical/Process Project Value – $200,000.