Skip to main content

Pure Piping

Quality Assurance

Our Quality

Quality Built Into Every Project

Quality assurance is integrated throughout every stage of our projects – from material procurement and fabrication through installation, testing and final handover. Our systems provide complete traceability and confidence that every project meets client and industry requirements.

100%

Traceable Materials

AS1796

Qualified Welders

End-to-End

Quality Documentation

QA Process

Quality at Every Stage

Every project follows a documented quality process designed to ensure traceability, compliance and consistent outcomes.

Material Traceability

Every material is identified, recorded and traceable from delivery through installation.

Qualified Welding

Certified welders follow approved welding procedures and documented weld records.

Inspection

Fabrication is inspected throughout production to verify compliance and workmanship.

Testing

Pressure testing, leak testing and verification are completed to project specifications.

Calibration

Calibrated equipment ensures accurate testing and measurement.

Documentation

Comprehensive QA records are supplied at project completion.

Quality Standards

Built Around Industry Standards

Our quality systems are developed around recognised Australian and international standards including:

✓ AS1796

✓ AS3992

✓ AS4041

✓ ASME B31.3

✓ ASME BPE

✓ ISO 9001 Principles

Quality Management

Meet our QA Manager : Brett Payne

Brett joined Pure Piping in July 2020, bringing extensive experience in business management, customer service, and operational leadership.

With a strong focus on delivering exceptional customer experiences and leveraging in-depth product knowledge, Brett plays a key role in driving productivity and supporting the continued growth of the business.

Passionate about quality and continuous improvement, Brett is committed to educating and mentoring staff on Quality Assurance processes to ensure consistently high standards and the best possible outcomes for our clients.

Brett holds a Bachelor’s degree in Multimedia Systems (Computer Programming), combining technical expertise with practical business management skills.

Project Documentation

Documentation You Can Rely On

At project completion, Pure Piping provides a comprehensive Quality Assurance dossier that delivers complete traceability of materials, fabrication and testing. Our documentation is structured in a clear, practical format, making it easy for clients, QA teams and regulatory auditors to review and verify every stage of the project.

We take great pride in the quality of our documentation, with positive feedback received from client quality departments across pharmaceutical, biotechnology and industrial sectors. Documentation is prepared to meet or exceed project specifications and relevant regulatory requirements, including organisations such as the TGA, APVMA and AIGA where applicable.

Built Around Recognised Standards

Pure Piping’s quality systems are developed to support the demanding requirements of hygienic and high-purity process industries. Our documentation aligns with recognised Australian and international standards, including:

✓ Good Manufacturing Practice (GMP)

✓ AS/NZS ISO 9004.5

✓ AS 3992

✓ ASME BPE

✓ NATA calibrated equipment

Documentation is prepared to satisfy project specifications and client quality requirements across regulated industries.

Material Records
  • Material Certificates
  • Heat Numbers
  • Material Traceability
  • Delivery Records
Welding Records
  • Welder Qualifications
  • Weld Maps
  • Weld Registers
  • Weld Procedures
  • Weld Logs
Inspection & Handover
  • Calibration Certificates
  • Pressure Test Records
  • Inspection Reports
  • Cleaning Records
  • Mechanical Completion
  • QA Dossier

Quality Commitment

Quality Is More Than Documentation

While documented quality systems are essential, exceptional results also depend on the experience, discipline and attention to detail of the people delivering the work. At Pure Piping, quality is embedded in every stage of the project - from the first material inspection to final handover.

Precision in Every Detail

Our reputation has been built on delivering consistently high-quality process piping systems. From material selection and fabrication through to installation and commissioning, every stage is completed with meticulous attention to detail and verified against documented quality procedures.

Built on Accountability

Quality is everyone's responsibility. Our qualified tradespeople, supervisors and project managers work within a culture of accountability where inspection, verification and continuous improvement are part of the daily workflow. The result is greater confidence, complete traceability and reliable outcomes for every client.